Type a keyword here and click search

Upper Dolfor Road - Mid Wales
Upper Dolfor Road - Mid Wales
TYPE Document
FILE SIZE 1.59 MB
DESCRIPTION Using aircrete, a certified modern method of construction, main contractor B.W Bellis was able to complete the block-work on the large six-bedroom property within six weeks. Apart from some technical assistance from H+H on working with aircrete, all of the block work was laid by a single worker during this time.
FILENAME Dolfor-Road-case-study.pdf